NewPlayFest Call for Scripts | AACT

NewPlayFest Call for Scripts

Call for Scripts for 2024 Cycle

Script submissions for AACT NewPlayFest 2024 are CLOSED
Scripts were accepted through June 30, 2022. The next cycle, AACT NewPlayFest 2026 will accept script submissions in the spring of 2024. 

Guidelines for Playwrights
  • Plays must be submitted between May 1, 2022 and June 30, 2022.
  • No fee for AACT member playwrights; $10 script processing fee for non-members.
  • Only one script per playwright accepted.
  • The Playwriting Contract should be reviewed prior to submission. Download Playwright Contract 2024 PDF at bottom of this page.
Script Guidelines
  • AACT NewPlayFest is open to non-musical, full-length plays.
  • No limit on number of characters.
  • No restrictions on subject (although excessive offensive language, sex, or violence might limit the play’s appeal for some community theatres).
  • Script must be unpublished and must not have received a full production. (If selected, the AACT theatre’s production is to be a world premiere.) (Self-publication is allowed as long as the script is only available from the playwright or the playwright's website.)
  • No translations or adaptations of previously published works.
  • The script will be workshopped with the director and cast of the Producing Theatre, the playwright, and an AACT selected dramaturge. Changes or revisions must have consent of Producer and Playwright.
Script Format
  • Must be submitted online in one Adobe Acrobat pdf format file. (Several free pdf converters can be found online.)
  • Must be written in English.
  • Minimum 60 pages, maximum 120 pages using 12pt Times New Roman or equivalent.
  • Use standard play format and follow the AACT NewPlayFest Script Formatting Guidelines. Download Script Formatting PDF at bottom of this page.
  • Script must include, near the front: cast list, brief character descriptions, and set requirements.
  • Script must have no indication of the author on any page or in the file properties. (This allows reviewers to be totally objective.)
Winning Plays & Productions
  • Semi-finalists will be notified October, 2022, and will be required to sign the Playwright Contract to be eligible as a finalist.
  • Finalists will be notified February, 2023.
  • Winners will be announced April, 2023.
  • You may download the Adjudication Process document at bottom of this page
  • The winning plays will be produced by American community theatres between June, 2023 and December, 2024. Producing Theatres have committed to a production of at least three performances with full production values. Submission of a script includes acceptance of production, if selected.
  • The Producing Theatre will pay the playwright a royalty of $50 per performance.
  • AACT has contracted with Dramatic Publishing Company to publish an anthology of the winning plays. Submission includes acceptance of publication in the anthology.
  • Productions will be publicized locally and nationally as World Premieres. Winning playwrights will be invited to travel to the respective Producing Theatres for a workshopping of the script with an AACT-selected dramaturge and a performance. (Producing Theatres will provide some funding for travel.) . See The Playwright Contract for more details on the workshop process, as well as articles in the current issue of the AACT magazine, Spotlight,

Please Note:

  • AACT only accepts online scripts through our NewPlayFest cycle submission process.
  • Incomplete submissions will be ineligible for inclusion in the festival.
  • The judges' decisions are final.
  • AACT and its associated contest judges will destroy all electronic script submissions after the close of the program. 

For questions about your submission, contact Susan Austin at [email protected] or the AACT office at 817-732-3177.

Script Submissions are open May 1-June 30, 2022.

Submit a Script

Documents 
Item Name File
Playwright Contract 2024 View/Download
Adjudication Process View/Download
Script Submission Form (Sample) View/Download
Script Formatting View/Download
Article on the Workshopping Process
(from the Jan.-Feb. 2022 issue of Spotlight)
View/Download

 

Authorize.Net Merchant - Click to Verify Credit Card Merchant Services